Jody · Development project
Operational & multimodal improvements on US 60 (Winchester Rd) from Midland to New Circle Rd. (2024CCN)
FAYETTE, Lexington (40505), KY
Roads & infrastructure · Proposed as of
On the record
- Address
- FAYETTE
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Record number
- 7-80309.00
- Source
- Kentucky Transportation Cabinet (KYTC) — Six-Year Highway Plan (SYP), 2026 enacted plan. KENTUCKY: the agency is the Transportation CABINET, not a DOT; KDOT is KANSAS. (kytc-syp-highway-plan)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- ADDRESS DEFICIENCIES OF BRIDGE ON S 75 NC OVER N BROADWAY & N LIMESTONE (034B00083L and 034B00083R) FAYETTE Roads & infrastructure · Proposed
- ADDRESS DEFICIENCIES OF BRIDGE ON BRYAN AVENUE OVER I-75 & I-64 (034B00048N) FAYETTE Roads & infrastructure · Proposed
- Modernize roadway, improve multi-mobility, and include safety and capacity improvements at intersections on US 60 (Versa FAYETTE Roads & infrastructure · Proposed
- Modernize roadway, improve multi-mobility, and include safety and capacity improvements at intersections on US 60 (Versa FAYETTE Roads & infrastructure · Proposed
- IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)(1 FAYETTE Roads & infrastructure · Proposed
- Tapping water main to provide water service for a new customer Roads & infrastructure · Proposed (no longer tracked)
All projects on record in 40505 · All projects on record in 40508
Status as of , from Kentucky Transportation Cabinet (KYTC) — Six-Year Highway Plan (SYP), 2026 enacted plan. KENTUCKY: the agency is the Transportation CABINET, not a DOT; KDOT is KANSAS.'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.