Jody · City development
Development in Logan, UT
8 distinct development projects on file across 3 of the 4 ZIP codes named Logan. A project that appears in more than one of these ZIP codes is counted once.
Project types
- Roads & infrastructure 8
Where projects stand
- Operating / built 3
- Proposed 3
- Approved 2
Recent projects
- UTN: Logan & North Logan Trail (Study) Trail project off-system located along 200 E, US-89, and 1600 E in Logan and Nort Roads & infrastructure · Proposed official record ZIP 84321
- UTN: Blacksmith Fork River Trail Blacksmith Fork River Trail (separated from roadway) Roads & infrastructure · Approved official record ZIP 84321
- Underpass below US-89/91 at Logan River (600 S) US-91; MP 25.87 - 25.88 & Underpass below SR89/91 at Logan River (600 So Roads & infrastructure · Operating / built official record ZIP 84321
- Logan Canyon Bridge Deck Preservation US-89; MP 461.35 - 484.43 Roads & infrastructure · Proposed official record ZIP 84321
- Cache Parkway Intersection and Road Relocation SR-30; MP 108.15 - 108.25 Roads & infrastructure · Approved official record ZIP 84321
- US-91; MP 29.36 to 29.45, North Logan, R1 FY21 SSW US-91; MP 29.36 - 29.45 & US-91; MP 29.36 to 29.45, North Logan, R1 F Roads & infrastructure · Proposed official record ZIP 84341
- Develop Trail Logan to Nibley US-91; MP 24.00 - 24.40 Roads & infrastructure · Operating / built official record ZIP 84321
- 200 East; 2200 N. to North Logan Boundary 200 EAST; 2200 NO TO 2500 NO. Roads & infrastructure · Operating / built official record ZIP 84341
ZIP codes are grouped by the place name on their Jody page, which follows the postal name and can differ from city limits. Compiled from official public records on . Every project links to its source record; nothing on this page is generated or inferred.