Development projects on record in 02421 · Lexington (02421), MA
12 projects, newest first.
- LEXINGTON- DECK REPLACEMENT, L-10-019 (2DW, 2DX), STATE ROUTE 2/CONCORD TURNPIKE OVER PLEASANT STREET LEXINGTON Roads & infrastructure · Proposed
- LEXINGTON- INSTALLATION OF SITE TRAILER AND UTILITY CONNECTIONS AT MAINTENANCE DEPOT AT WATERTOWN STREET LEXINGTON Roads & infrastructure · Proposed
- WALTHAM- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 WALTHAM Roads & infrastructure · Proposed
- LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 LEXINGTON Roads & infrastructure · Approved
- WESTFIELD- METAL BUILDING ALTERATIONS AT 270 EAST MAIN STREET MAINTENANCE DEPOT WESTFIELD Roads & infrastructure · Approved
- CAMBRIDGE- ARLINGTON- BELMONT- LEXINGTON- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2 ARLINGTON - BELMONT Roads & infrastructure · Approved
- LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2 ARLINGTON - BELMONT - CAMBRIDGE - LEXINGTON Roads & infrastructure · Operating / built
- LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET LEXINGTON Roads & infrastructure · Operating / built
- LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 BURLINGTON - LEXINGTON Roads & infrastructure · Operating / built
- LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGN-BUILD) LEXINGTON Roads & infrastructure · Operating / built
- DISTRICT 4- RAMP RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (128) FROM LYNNFIELD TO WELLESLEY BURLINGTON - Roads & infrastructure · Proposed
- LEXINGTON- LINCOLN- REPLACEMENT OF CONCRETE MEDIAN BARRIER ON A SECTION OF ROUTE 2 (CAMBRIDGE TURNPIKE) LEXINGTON - LINC Roads & infrastructure · Proposed