Development projects on record in 02668 · West Barnstable (02668), MA
8 projects, newest first.
- BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6 BARNSTABLE Roads & infrastructure · Proposed
- BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY) BARNSTABL Roads & infrastructure · Proposed
- BARNSTABLE- SYSTEMATIC BRIDGE PRESERVATION, B-01-011 (49T) AND B-01-016 (49R), ROUTE 149 (MEETING HOUSE WAY) OVER ROUTE Roads & infrastructure · Operating / built
- BARNSTABLE- LIGHTING & LANDSCAPING OF THE ROUNDABOUT AT THE MID-CAPE HIGHWAY (ROUTE 6) EASTBOUND EXIT RAMP & ROUTE 149 B Roads & infrastructure · Operating / built
- BARNSTABLE- BOURNE- SANDWICH- INSTALLATION OF REAL TIME TRAFFIC MONITORING (RTTM) SYSTEM AND VARIABLE MESSAGE BOARDS ON Roads & infrastructure · Operating / built
- BOURNE- SANDWICH- RESURFACING OF ROUTE 6 (MID-CAPE HIGHWAY), FROM SAGAMORE BRIDGE TO SANDWICH/BARNSTABLE T.L. INCLUDES 6 Roads & infrastructure · Operating / built
- BARNSTABLE- LANDSCAPING & IMPROVEMENTS ON ROUTE 132, FROM ROUTE 6 TO BEARSE'S WAY BARNSTABLE Roads & infrastructure · Operating / built
- Barnstable Cape Cod Rail Trail Phase 4 BARNSTABLE Roads & infrastructure · Proposed