Development projects on record in 05149 · Ludlow (05149), VT
4 projects, newest first.
- LUDLOW Permanent repairs to stone culvert (MP 29.08) as a result of damage sustained during July 2023 flood event. FEMA project. Roads & infrastructure · Approved
- LUDLOW Permanent repairs to culvert & inlet at milepost 28.15 on the GMRC Rail Line. Damage from 4720 storm. Roads & infrastructure · Approved
- LUDLOW Permanent repairs at milepost 28.07 on the GMRC Rail Line. Damage from 4720 storm. Roads & infrastructure · Approved
- STATEWIDE Traffic & Safety, Signs Sign replacement on VT 100 from Weston ETE 58.281 to Bridgewater ETE 86.051 and on US 4 from Bridgewater ETE 41.759 to Woodstock ETE 48.894. Class 1 segments are not included. Roads & infrastructure · Approved