Development projects on record in 05742 · East Wallingford (05742), VT
3 projects, newest first.
- WALLINGFORD Final repairs from FEMA DR 4720. Restore culvert inlet along with embankment stabilization, MP 39.98. Roads & infrastructure · Approved (no longer tracked)
- WALLINGFORD Permanent repairs at milepost 40.09 on the GMRC Rail Line. Damage from 4720 storm. Roads & infrastructure · Approved (no longer tracked)
- MT. HOLLY State Hwy Bridge, Reconstruction Replacement of bridge #11 on VT 155 in Mt Holly at MM 4.998 due to VT23-1. DDIR-D3-VT155-BR11. Roads & infrastructure · Approved