Development projects on record in 48346 · Clarkston (48346), MI
14 projects, newest first.
- LAND USE HILLTOP BREWERY, TWO DAY OCTOBERFEST EVENT OCTOBER 2-3, 2026. APPROVED HOURS: 6:00 PM - 11:00 PM WEST AND NORT Industrial · Approved
- LAND USE OUTDOOR DISPLAY/SALES WATER SOFTENER SALT MON-FRI 9AM-5PM, SAT 9AM-2PM *REVISED 9/8/26 - CHANGED LOCATION APP Other project · Operating / built
- LAND USE OUTDOOR STORAGE OF MULCH, SOIL, ROCK AND LANDSCAPE SUPPLIES APPROVED PER BO *SEE ATTACHMENT Other project · Operating / built
- LAND USE TEMPORARY PLACEMENT OF "TORRES MEXICAN GRILL" FOOD TRUCK APPROVED DATES: AUGUST 28 - SEPTEMBER 27, 2026 NEXT TO Other project · Approved
- LAND USE 10 X 20 ACCESSORY STRUCTURE (CAR PORT) REV BY BO NOTE: MICHAEL ALLEN IS SPOUSE OF SHASTA PRICE. EMAILED APPLI Other project · Approved
- LAND USE FOOD TRUCK, APPROVED DATES: 8/17/2026 - 9/14/2026 REV BY BO Other project · Approved (no longer tracked)
- LAND USE 10' X 16' ACCESSORY STRUCTURE *NEW SHED MUST BE 10 FT FROM REAR AND SIDE PROPERTY LINES REV BY BO Other project · Approved
- LAND USE B EXIST COMMERCIAL BUSINESS, "GREAT LAKES ACE HARDWARE": OUTDOOR STORAGE, SOILS AND SALTS REV BY BO *SEE CODE Commercial · Operating / built
- LAND USE TEMPORARY PLACEMENT OF "TORRES MEXICAN GRILL" FOOD TRUCK APPROVED DATES: JULY 27 - AUGUST 27, 2026 NEXT TO BUIL Other project · Operating / built
- LAND USE TEMPORARY PLACEMENT OF "TORRES MEXICAN GRILL" FOOD TRUCK APPROVED DATES: JUNE 18- JULY 18, 2026 NEXT TO BUILDIN Other project · Operating / built
- LAND USE 8 X 20' ACCESSORY STRUCTURE REV BY BO *CODE ENFORCEMENT - WILL MOVE SHED Other project · Operating / built
- LAND USE 10 X 12 ACCESSORY STRUCTURE REV BY BO *PLANS ATTACHED TO PERMIT Other project · Operating / built
- LAND USE TEMPORARY PLACEMENT OF "TORRES MEXICAN GRILL" FOOD TRUCK APPROVED DATES: MAY 17 - JUNE 17, 2026 NEXT TO BUILDIN Other project · Operating / built
- LAND USE 90 SQ FT ACCESSORY STRUCTURE REV BY BO Other project · Operating / built