Development projects on record in 77477 · Stafford (77477), TX
11 projects, newest first.
- IH 69 Surfacing/Roadway Restoration E of SS 529 Harris C/L Roads & infrastructure · Approved
- IH 69 Surfacing/Roadway Restoration SH 99 Harris County Line Roads & infrastructure · Approved
- IH 69 Landscape Development Brazos Canyon Drive Harris County Line Roads & infrastructure · Approved
- UA 90 Landscape Development IH 69 Harris County Line Roads & infrastructure · Approved
- UA 90 Advanced Traffic Management System IH 69 Present Street Roads & infrastructure · Approved
- FM 1092 Surfacing/Roadway Restoration Harris County Line SH 6 Roads & infrastructure · Approved
- FM 1092 Install Raised Median Harris C/L SH 6 Roads & infrastructure · Approved
- UA 90 Landscape Development IH 69 Gessner Road Roads & infrastructure · Approved
- US 90A GR, STRS, BASE & PAVEMENT 0.1 MI W OF PRESENT ST HARRIS C/L Roads & infrastructure · Approved
- FM 1092 Hazard Elimination & Safety Lexington Blvd SH 6 Roads & infrastructure · Proposed
- UA 90 Furnish & Install Dynamic Message Signs Pitts Road Cravens Road Roads & infrastructure · Proposed