Development projects on record in 98004 · Bellevue (98004), WA
15 projects, newest first.
- Tenant Improvement Meridian 10500 NE 8th St Commercial · Proposed
- Tenant Improvement - New Use Snapdoodle Toys & Games 575 Bellevue Square Commercial · Proposed
- Single Family New Enatai 105th 1646 105th Ave SE Residential · Proposed
- Tenant Improvement Banana Republic 575 Bellevue Square Commercial · Proposed
- Tenant Improvement Indochino 575 Bellevue Square Commercial · Proposed
- I-90/EB East Channel Bridge - Modular Assembly Joints Modular Assembly Joints - Br 90/40S 090 King Roads & infrastructure · Operating / built
- I-405/Renton to Bellevue - Corridor Widening & ETL (Stage 2) Corridor Widening & Express Toll Lanes 405 King Roads & infrastructure · Operating / built
- I-405/61st Ave S to SE 8th St - Seismic Retrofit Seismic Retrofit - 405/005, 405/011, 405/015 405 King Roads & infrastructure · Operating / built
- I-405/Toll Vendor for Renton to Bellevue - Toll System Express Toll Lanes Implementation 405 King Roads & infrastructure · Operating / built
- I-405/BN RR Bridge to Pedestrian Trail Bridge - Seismic Retrofit(Toll) Seismic Retrofit 405 King Roads & infrastructure · Operating / built
- I-405/BN RR Bridge to Pedestrian Trail Bridge - Seismic Retrofit Seismic Retrofit 405 King Roads & infrastructure · Operating / built
- I-405/SR 520 Ramps and SR 527 to I-5 - Paving HMA Paving 405 King, Snohomish Roads & infrastructure · Operating / built
- I405/Bellevue-Lynnwood R&R-Roadway Toll System Network Equipment Replace Repair, replace, and regular upgrade the networ 405 King, Snohomish Roads & infrastructure · Approved
- SR 520/I-5 to Medina - Evergreen Point Floating Bridge and Landings Replace Floating Bridge and Landings 520 King Roads & infrastructure · Operating / built
- SR 520/Evergreen Point Floating Bridge R&R - Preservation Renew and replacement plan 520 King Roads & infrastructure · Approved