Jody · Development project
Pvmt Rehab-Campville Rd RMMCP Pavement reconstruction of approximately 2,500 feet of Campville Road in Litchfield, from
Roads & infrastructure · Approved as of
On the record
- Type
- Roads & infrastructure
- Where it stands
- Approved
- Status as of
- Date on record
- (scheduled)
- Record number
- 0073-0198
- Source
- Connecticut Department of Transportation (CTDOT) (ctdot-project-work-areas)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- Muni Speed Limit D3&D4 (Rural) Install retroreflective Speed Limit Signs on Rural, Municipally owned and maintained road Ansonia, Avon, Barkhamsted, Beacon Falls, Bethany, Bethel, Bethlehem, Bloomfield, Branford, Bridgeport, Bridgewater, Bristol, Brookfield, Burlington, Canaan, Canton, Cheshire, Clinton, Colebrook, Cornwall, Danbury, Darien, Derby, Durham, East Granby, East Haven, Easton, Enfield, Fairfield, Farmington, Goshen, Granby, Greenwich, Guilford, Hamden, Hartland, Harwinton, Kent, Killingworth, Litchfield, Madison, Meriden, Middlebury, Middlefield, Milford, Monroe, Morris, Naugatuck, New Canaan, New Fair Roads & infrastructure · Approved
- 6" Edge Line D4 (Rural, State) Install 6-inch wide edge lines at horizontal curve locations on Rural, State owned and ma Ansonia, Avon, Barkhamsted, Beacon Falls, Bethany, Bethel, Bethlehem, Bloomfield, Bridgewater, Bristol, Brookfield, Burlington, Canaan, Canton, Cheshire, Colebrook, Cornwall, Danbury, Derby, East Granby, Easton, Enfield, Farmington, Goshen, Granby, Hartland, Harwinton, Kent, Litchfield, Middlebury, Monroe, Morris, Naugatuck, New Fairfield, New Hartford, New Milford, Newington, Newtown, Norfolk, North Canaan, Orange, Oxford, Plymouth, Prospect, Redding, Ridgefield, Roxbury, Salisbury, Seymour, Sh Roads & infrastructure · Approved
- D4 Midblock Crosswalk Upgrades Installation of approx. 25 Rapid Rectangular Flashing Beacons (RRFBs) at high risk, uncon Ansonia, Danbury, New Milford, Thomaston Roads & infrastructure · Approved
- D4 Traffic Control Signals Replacement of traffic control signals to meet current standards at various locations in Dist Barkhamsted, Brookfield, Danbury, Litchfield, Seymour, Suffield, Winchester Roads & infrastructure · Approved
- D4 UHPC Beam End Repairs Address steel beam end deterioration on various NHS and Non-NHS bridges in District 4 using Ult Roads & infrastructure · Approved
- D4 Traffic Signal Revisions Replacement of traffic signal controllers and cabinets at approximately 60 state-owned traff Ansonia, Avon, Beacon Falls, Bethel, Brookfield, Burlington, Danbury, Derby, East Granby, Farmington, Litchfield, Middlebury, Naugatuck, New Fairfield, New Hartford, New Milford, Newtown, Oxford, Plymouth, Prospect, Redding, Ridgefield, Seymour, Simsbury, Southbury, Suffield, Thomaston, Torrington, Waterbury, Watertown, Woodbury Roads & infrastructure · Approved
All projects on record in 06778 · All projects on record in 06787
Status as of , from Connecticut Department of Transportation (CTDOT)'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.