Jody · Development project
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275 INTERCHANGE WITH KY-9 (AA HWY.) (2024CCN)
CAMPBELL, Newport (41076), KY
Roads & infrastructure · Proposed as of
On the record
- Address
- CAMPBELL
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Record number
- 6-80311.00
- Source
- Kentucky Transportation Cabinet (KYTC) — Six-Year Highway Plan (SYP), 2026 enacted plan. KENTUCKY: the agency is the Transportation CABINET, not a DOT; KDOT is KANSAS. (kytc-syp-highway-plan)
- Official record
- View the source record
Where it is
On the Jody page for this ZIP code:
More projects in Newport (41076)
- ADDRESS CONDITION OF I-275 FROM MILEPOINT 73.061 TO MILEPOINT 77.579 CAMPBELL Roads & infrastructure · Proposed
- REDUCE CONGESTION ALONG THE I-471 CORRIDOR FROM US-27 TO OHIO STATE LINE. (2024CCR) CAMPBELL Roads & infrastructure · Proposed
Status as of , from Kentucky Transportation Cabinet (KYTC) — Six-Year Highway Plan (SYP), 2026 enacted plan. KENTUCKY: the agency is the Transportation CABINET, not a DOT; KDOT is KANSAS.'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.