Jody · Development project
MANCHESTER Const. ADA compliant pedestrian bicycle trail along Perimeter Rd., South Willow St. and Harvey Rd.
Perimeter Rd. South Willow St. Harvey Rd., Londonderry (03053), NH
Roads & infrastructure · Proposed as of
On the record
- Address
- Perimeter Rd. South Willow St. Harvey Rd.
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Record number
- 42509
- Source
- New Hampshire Department of Transportation (nhdot-ten-year-plan-projects)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- MANCHESTER Construct a northbound right turn lane and modify lane utilization at Willow St. & Weston Rd Inter. Willow Street/Weston Road Roads & infrastructure · Approved
- LONDONDERRY Operational and safety improvements at the intersection of NH 28 & Stonehenge Road. NH 28/Stonehenge Road Roads & infrastructure · Approved
- MANCHESTER Construct multi-use path along Baker St, Brown Ave, Dubisz St, and Sundial Ave. (14-25TAP) Rail Trail Roads & infrastructure · Operating / built
- MANCHESTER Implement an Adaptive Signal Control system on Granite St &Upgrade So. Willow St.signal performance Granite St & South Willow St Roads & infrastructure · Operating / built
- MANCHESTER Address Red List bridge carrying Huse Road over I-293 and NH Route 101 (176/106) Huse Road Roads & infrastructure · Operating / built
- DERRY-LONDONDERRY I-93 EXIT 4A - Prelim., Final Design, ROW & Construction of NEW INTERCHANGE and connecting roadway I-93 Roads & infrastructure · Proposed
All projects on record in 03053 · All projects on record in 03103
Status as of , from New Hampshire Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.