Jody · Development project
206 Route 206, Doctors Way to Valley Road
This project, a breakout of "Route 206, Old Somerville Road to Brown Avenue (15N)" (Southern section), will provide congestion relief, and operational and safety improvements. The project will include widening from two lanes to four lanes, revision of three existing traffic signals and replacement of the bridge over Royce Brook. This project will be bicycle/pedestrian compatible., Hillsborough (08844), NJ
Roads & infrastructure · Proposed as of
On the record
- Address
- This project, a breakout of "Route 206, Old Somerville Road to Brown Avenue (15N)" (Southern section), will provide congestion relief, and operational and safety improvements. The project will include widening from two lanes to four lanes, revision of three existing traffic signals and replacement of the bridge over Royce Brook. This project will be bicycle/pedestrian compatible.
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 108022
- Source
- New Jersey Department of Transportation (nj-stip-projects)
- Official record
- View the source record
Where it is
On the Jody page for this ZIP code:
More projects in Hillsborough (08844)
- Hamilton Road, Bridge over Conrail RR Initiated by the Bridge Management System, this project will replace the orphan bridge, built in 1918. Pavement work will be included to mill and resurface the immediate approaches, and to tie in with the new bridge's approach slabs. Minor widening will be required to transition from the existing roadway cross-section to the new bridge's cross-section. The existing height will be increased, in order to clear the CSXT railroad right-of-way, and will meet NJDOT minimum vertical under clearance. A sidewalk will be provided on the North side of the bridge. Roads & infrastructure · Proposed
- 206 Route 206, Valley Road to Brown Avenue This project, a breakout of "Route 206, Old Somerville Road to Brown Avenue (15N) (Northern Section)", will provide congestion relief, and operational and safety improvements. The project will include widening from two lanes to a four lane dualization, relocation of two existing traffic signals (adding two new jug handles) and replacement of the railroad bridge over Route 206. This project will be bicycle/pedestrian compatible. Roads & infrastructure · Proposed
Status as of , from New Jersey Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.