Jody · Development project
79 Route 79, Route 9 to Route 34 (Middlesex Street)
Initiated from the Pavement Management System, this project will rehabilitate the pavement within the project limits., Freehold (07728), NJ
Roads & infrastructure · Proposed as of
On the record
- Address
- Initiated from the Pavement Management System, this project will rehabilitate the pavement within the project limits.
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 153800
- Source
- New Jersey Department of Transportation (nj-stip-projects)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- CR 516 CR 516 (Old Bridge-Matawan Road, Bridge over Lake Lefferts The existing bridge is functionally obsolete and has been inspected on an emergency basis, the result of which has now classified the structure as structurally deficient. The bridge is 90 years old and of masonry and timber construction with a steel superstructure. Roads & infrastructure · Proposed
- 9 Route 9, Salem Hill Road to Texas Road (CR 690) Intersections This project will add Transit Signal Priority (TSP) technology at all major intersections, within the project limits to improve travel times and agency effectiveness. Roads & infrastructure · Proposed
- Union Hill Road, Bridge over Route 9 Initiated from the Bridge Management System, this project will replace or rehabilitate the structurally deficient bridge, built in 1940 and modified in 1997. Roads & infrastructure · Proposed
- 33 Route 33 Business, Bridge over Conrail Freehold Secondary Branch Initiated by the Bridge Management System, this project will replace the structurally deficient bridge, built in 1925. Roads & infrastructure · Proposed
- 34 Route 34, CR 537 to Washington Ave., Pavement Initiated from the Pavement Management System, one element of this project will provide a full depth pavement reconstruction, and address guiderails and drainage issues. The project scope will include; roadside work to restore the berm areas back to umbrella sections, earthwork to re-establish eroding slopes behind the guiderails, upgrading of guiderails, repairing damaged drainage and outfall structures, and upgrading traffic signals. Initiated from the Bridge Management System, another element of this project will replace the bridge deck and superstructure of the Bridge over Gravelly Brook on Route 34. The project scope will also include minor repairs to the substructure of the Bridge to correct deficiencies. The following federal appropriations were repurposed to this project: DEMO ID# NJ 238 & 259. Roads & infrastructure · Proposed
Status as of , from New Jersey Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.