Jody · Development project
I-15; Arizona State Line to Cottonwood Creek I-15; MP .00 - 6.00 & I-15; MP .00 - 6.00 & I-15; MP 14.15 - 19.60 & I-15;
I-15; MP .00 - 6.00 & I-15; MP .00 - 6.00 & I-15; MP 14.15 - 19.60 & I-15; MP 8.00 - 10.61 & I-15; MP 14.15 - 19.45 & I-15; MP 8.00 - 10.61, Hurricane (84737), UT
Roads & infrastructure · Operating / built as of
On the record
- Address
- I-15; MP .00 - 6.00 & I-15; MP .00 - 6.00 & I-15; MP 14.15 - 19.60 & I-15; MP 8.00 - 10.61 & I-15; MP 14.15 - 19.45 & I-15; MP 8.00 - 10.61
- Type
- Roads & infrastructure
- Where it stands
- Operating / built
- Status as of
- Date on record
- (filed)
- Record number
- 19910
- Source
- Utah Department of Transportation (udot-active-projects-lines)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- UTN: Halfway Wash Trail Gap Trail is off of the LRS, located along the Santa Clara River from Dixie Dr to 540 N Trail is off of the LRS, located along the Santa Clara River from Dixie Dr to 540 N Roads & infrastructure · Proposed
- I-15; SR-18 Bridge Collision Repair, 0C 588 I-15; MP 5.93 - 6.69 I-15; MP 5.93 - 6.69 Roads & infrastructure · Approved
- Var. Locations; Sinusoidal Rumble Strips US-191; MP 117.05 - 120.64 & SR-118; MP 10.00 - 12.81 & US-89; MP 294.21 - 295. US-191; MP 117.05 - 120.64 & SR-118; MP 10.00 - 12.81 & US-89; MP 294.21 - 295.72 & SR-18; MP 7.20 - 10.40 Roads & infrastructure · Proposed
- UTN: SR-7 (Southern Parkway) Trail SR-7; MP 10.57 - 12.37 & SR-7; MP 6.15 - 6.71 & Trail (separated from roadway), north SR-7; MP 10.57 - 12.37 & SR-7; MP 6.15 - 6.71 & Trail (separated from roadway), northern most segment to run alongside development roadway and connect to their trail system. Roads & infrastructure · Proposed
- Virgin River Trail - Feasibility Study Virgin River Trail - Sunrise Valley Park in Washington City to Grandpa¿s Pond in Virgin River Trail - Sunrise Valley Park in Washington City to Grandpa¿s Pond in Hurricane Roads & infrastructure · Proposed
- Sheep Bridge Road Trail - Design Phase Cnty:FA-3197; MP .00 - 4.86 Cnty:FA-3197; MP .00 - 4.86 Roads & infrastructure · Proposed
All projects on record in 84737 · All projects on record in 84770 · All projects on record in 84780 · All projects on record in 84790 · All projects on record in 86432
Status as of , from Utah Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.