Jody · Development project
I-15 31st St Interchg SB on-ramp meter FROM SR-79 31ST STREET; MP .28 - .28
FROM SR-79 31ST STREET; MP .28 - .28, Ogden (84405), UT
Roads & infrastructure · Proposed as of
On the record
- Address
- FROM SR-79 31ST STREET; MP .28 - .28
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 23603
- Source
- Utah Department of Transportation (udot-active-projects)
- Official record
- View the source record
Where it is
On the Jody page for this ZIP code:
More projects in Ogden (84405)
- 2700 E & SR-60 Widening for Left & Right Turn Lane 2700 East; South Weber Drive to 7800 South 2700 East; South Weber Drive to 7800 South Roads & infrastructure · Proposed
- UTN: Harrison Boulevard Trail Gap (Study) Trail project off-system located along Harrison Blvd in Ogden Trail project off-system located along Harrison Blvd in Ogden Roads & infrastructure · Proposed
- UTN: Hill AF Base Three Gate Trail - Study Trail Study (separated from roadway) Trail Study (separated from roadway) Roads & infrastructure · Proposed
- 40th; Riverdale to Washington Cnty:FA-3354; MP .00 - .47 Cnty:FA-3354; MP .00 - .47 Roads & infrastructure · Approved
- Riverdale Road Interchange Concept SR-26; MP .20 - .50 SR-26; MP .20 - .50 Roads & infrastructure · Operating / built
- Various Locations, WWD Ramp Upgrades SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .0 SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .00 - 112.10 & I-15; MP 315.00 - 400.00 & I-15; MP 315.00 - 400.00 Roads & infrastructure · Approved
Status as of , from Utah Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.