Jody · Development project
RICHMOND-COLCHESTER Interstate Pavement, Rehabilitation
Paving on I89 from Richmond MM 78.6 to Colchester MM 91.882 SB including ramps., South Burlington (05403), VT
Roads & infrastructure · Approved as of
On the record
- Address
- Paving on I89 from Richmond MM 78.6 to Colchester MM 91.882 SB including ramps.
- Type
- Roads & infrastructure
- Where it stands
- Approved
- Status as of
- Record number
- IM 089-2(64)
- Source
- Vermont Agency of Transportation (VTrans) (vtrans-project-locations-lines)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- SOUTH BURLINGTON Bike & Ped Design and construction of new bicycle/pedestrian facilities, bridge and appurtenances over I-89 in South Burlington at Exit 14 – East-West Alternative Transportation Crossing. Roads & infrastructure · Approved
- 8ArthurCourt_RTOS 8 Arthur Court 8 Residential · Operating / built
- CEP-26-355 11 Arthur Court 11 Residential · Proposed
- RICHMOND-COLCHESTER Interstate Pavement, Rehabilitation Paving on I89 from Richmond MM 78.6 to Colchester MM 91.885 NB including ramps. Roads & infrastructure · Approved
- COLCHESTER-SWANTON Interstate Pavement, Rehabilitation Paving on I89 from Colchester MM 91.886 to Milton MM 102 NB and ramps and from St. Albans MM 113.4 to Swanton MM 118.2 NB. Roads & infrastructure · Approved
- COLCHESTER-SWANTON Interstate Pavement, Rehabilitation Paving on I89 from Colchester MM 91.882 to Milton MM 101.977 SB and St. Albans MM 113.294 to Swanton MM 118.189 SB. Roads & infrastructure · Approved
All projects on record in 05403 · All projects on record in 05404 · All projects on record in 05446 · All projects on record in 05477 · All projects on record in 05495
Status as of , from Vermont Agency of Transportation (VTrans)'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.