Jody · Development project
SPRINGFIELD Bike & Ped
This project involves the final design, permitting and construction of an approximately 3,250 foot long extension of the Toonerville Trail in order to connect the existing shared-use path to Bridge Street and the Edgar May Recreation Center., Springfield (05156), VT
Roads & infrastructure · Approved as of
On the record
- Address
- This project involves the final design, permitting and construction of an approximately 3,250 foot long extension of the Toonerville Trail in order to connect the existing shared-use path to Bridge Street and the Edgar May Recreation Center.
- Type
- Roads & infrastructure
- Where it stands
- Approved
- Status as of
- Record number
- STP BP16(8)
- Source
- Vermont Agency of Transportation (VTrans) (vtrans-project-locations)
- Official record
- View the source record
Where it is
On the Jody page for this ZIP code:
More projects in Springfield (05156)
- CHARLESTOWN, NH - SPRINGFIELD, VT Address bridge carrying NH 11 over Conn River between Charlestown, NH and Springfield, NH 11 Roads & infrastructure · Proposed
- ROCKINGHAM-SPRINGFIELD Interstate Pavement, Rehabilitation Paving on I91 from Rockingham MM 31.291 to Springfield MM 41.4 SB including ramps. Project will also pave Westminster MM 30.01 to Rockingham MM 32.7 NB. Roads & infrastructure · Approved
Status as of , from Vermont Agency of Transportation (VTrans)'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.