Jody · Development project
STH 27 - CTH D Rehabilitation of structure B-09-0382 and all incidentals necessary.
YELLOW RIVER BRIDGE B-09-0382 CHIPPEWA, Boyd (54726), WI
Roads & infrastructure · Proposed as of
On the record
- Address
- YELLOW RIVER BRIDGE B-09-0382 CHIPPEWA
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Record number
- 89200674
- Source
- Wisconsin Department of Transportation (WisDOT) — 6-Year Highway Improvement Program (wisdot-highway-program-6yr)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- NW REGION, GUARDRAIL REPLACEMENT To Be Determined STH 29, USH 53, IH94 CHIPPEWA Roads & infrastructure · Proposed
- NW REGION, STH 29 BRDG DECK SEALING Bridge deck sealing on 74 bridge structures on STH 29. BRIDGE DECK SEALING (VAR) CHIPPEWA Roads & infrastructure · Proposed
- NW REGION, MMA OVERLAYS Rehabilitate the following bridges B03-0059, B16-0019, B16-0049, B54-0015, B03-0062, B47-0038, B MMA OVERLAYS DUNN Roads & infrastructure · Proposed
- CADOTT - CORNELL Mill and overlay the existing pavement, along with all incidentals necessary. STH 29 TO JOHNSON ROAD CHIPPEWA Roads & infrastructure · Proposed
- BOYD - ESTELLA Replace and remove the existing pavement, along with all incidentals necessary. CTH O TO CTH S NORTH CHIPPEWA Roads & infrastructure · Proposed
Status as of , from Wisconsin Department of Transportation (WisDOT) — 6-Year Highway Improvement Program's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.