Jody · Development project
VA STATE LINE - ARDEN Renovation and Replacement: Roadway
Berkeley, Martinsburg (25403), WV
Roads & infrastructure · Proposed as of
On the record
- Address
- Berkeley
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Agency's own status
- Planned
- Status as of
- Record number
- 2026020035
- Source
- West Virginia Division of Highways (WVDOT) (wvdoh-active-projects)
- Official record
- View the source record
Status history
Jody has watched this record since .
- : First seen by Jody; agency status: Planned
Each date is the day Jody saw the change in the agency's public records, not necessarily the day the agency acted. Not every project moves through every stage: an application can be withdrawn, denied, revised or paused, and the agency's own status word is shown as published.
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- 2025 D5 RDWY DEPART Renovation and Replacement: Roadway Berkeley Roads & infrastructure · Proposed
- EXIT 14 - DRY RUN ROAD Renovation and Replacement: Roadway Berkeley Roads & infrastructure · Proposed
- OAK GROVE SCHOOL ROAD RESURFACE Renovation and Replacement: Roadway Berkeley Roads & infrastructure · Proposed
- CAMP FRAME ROAD RESURFACE Renovation and Replacement: Roadway Berkeley Roads & infrastructure · Proposed
- HARLAN RUN BRIDGE Renovation and Replacement: Bridge Berkeley Roads & infrastructure · Proposed
- D5 COUNTY EAST RDWY DEPART +30 Renovation and Replacement: Roadway District 5 Roads & infrastructure · Proposed
All projects on record in 25403 · All projects on record in 25420 · All projects on record in 25421 · All projects on record in 25427
Status as of , from West Virginia Division of Highways (WVDOT)'s public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.