Development projects on record in 07849 · Lake Hopatcong (07849), NJ
1 project, newest first.
- 15 Route 15 Corridor, Rockfall Mitigation, Contract B This section of rock cuts includes the 2 highest-ranked cut slopes within the Rockfall Hazard Management System (RHMS) yet to be assigned for mitigation design; the group contains several other cut slopes ranked within the top 12%. The slopes exhibit many loose boulders and overhanging blocks, which, in conjunction with the limited catch areas, present the potential for falling material to impact the traveled roadway. In addition, within the last year, one location had a Rockfall event where a 20-ton boulder fell upon guiderail. Roads & infrastructure · Proposed