Jody · Development project
15 Route 15 Corridor, Rockfall Mitigation, Contract B
This section of rock cuts includes the 2 highest-ranked cut slopes within the Rockfall Hazard Management System (RHMS) yet to be assigned for mitigation design; the group contains several other cut slopes ranked within the top 12%. The slopes exhibit many loose boulders and overhanging blocks, which, in conjunction with the limited catch areas, present the potential for falling material to impact the traveled roadway. In addition, within the last year, one location had a Rockfall event where a 20-ton boulder fell upon guiderail., Dover (07801), NJ
Roads & infrastructure · Proposed as of
On the record
- Address
- This section of rock cuts includes the 2 highest-ranked cut slopes within the Rockfall Hazard Management System (RHMS) yet to be assigned for mitigation design; the group contains several other cut slopes ranked within the top 12%. The slopes exhibit many loose boulders and overhanging blocks, which, in conjunction with the limited catch areas, present the potential for falling material to impact the traveled roadway. In addition, within the last year, one location had a Rockfall event where a 20-ton boulder fell upon guiderail.
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 154410
- Source
- New Jersey Department of Transportation (nj-stip-projects)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- 15 Route 15 NB, Bridge over Abandoned Mount Hope Mineral Railroad Route 15 NB Bridge over the abandoned Mount Hope Mineral Railroad bridge broke out of the Route 80, Route 15 Interchange project scope of work and advanced as a separate bridge replacement project. Roads & infrastructure · Proposed
- 46 Route 46, Pequannock Street to CR 513 (West Main Street) Initiated from the Safety Management System, this project will evaluate each signalized intersection within the project limits. Some of these signalized intersections have had adjustments over the past few years, however, each signalized intersection will be (re)evaluated and, if required, modified in the proposed new Road Diet design. Work will include, but not be limited too; insuring that signalized intersections have the appropriate number/type of traffic signal heads at the appropriate locations, each intersection is ADA compliant, backplates with retro reflective borders will be added to the traffic signal heads, all 8” traffic signal heads will be changed to 12”, and pedestrian signal heads include countdown technology. Roads & infrastructure · Proposed
- 80 Route 80/15 Interchange This project will: provide the missing Rt. 15 Northbound/Southbound to I-80 Eastbound/Westbound ramp to reduce congestion within Wharton and to provide direct access to the interstate; improve the acceleration lane from Rt.15 to I-80 Westbound to improve its safety and operation; reconstruct the intersection of Rt. 15 & Dewey Ave. to improve its level of service; improve the weaving length between North Main St. & Ramp “K”; improve the geometry of Ramp “I” to enhance truck movements; and improve the lane width and add shoulders at the merge of Rt. 15 Northbound and I-80 Westbound to improve its operation and safety. Along with the four structures listed, Structure # 1413152 is also a part of this project Roads & infrastructure · Proposed
Status as of , from New Jersey Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.