Development projects on record in 54727 · Cadott (54727), WI
5 projects, newest first.
- STH 27 - CTH D Rehabilitation of structure B-09-0382 and all incidentals necessary. YELLOW RIVER BRIDGE B-09-0382 CHIPPEWA Roads & infrastructure · Proposed
- CADOTT - CORNELL Mill and overlay the existing pavement, along with all incidentals necessary. STH 29 TO JOHNSON ROAD CHIPPEWA Roads & infrastructure · Proposed
- NW REGION, MMA OVERLAYS Rehabilitate the following bridges B03-0059, B16-0019, B16-0049, B54-0015, B03-0062, B47-0038, B MMA OVERLAYS DUNN Roads & infrastructure · Proposed
- NW REGION, STH 29 BRDG DECK SEALING Bridge deck sealing on 74 bridge structures on STH 29. BRIDGE DECK SEALING (VAR) CHIPPEWA Roads & infrastructure · Proposed
- NW REGION, GUARDRAIL REPLACEMENT To Be Determined STH 29, USH 53, IH94 CHIPPEWA Roads & infrastructure · Proposed