Development projects on record in 84401 · Ogden (84401), UT
8 projects, newest first.
- UTN: Harrison Boulevard Trail Gap (Study) Trail project off-system located along Harrison Blvd in Ogden Trail project off-system located along Harrison Blvd in Ogden Roads & infrastructure · Proposed
- UTN: Three Gate Trail Extension Trail project off-system from Weber River Parkway through Observatory Park, and along A Trail project off-system from Weber River Parkway through Observatory Park, and along A Ave to 24th St in Ogden Roads & infrastructure · Proposed
- BDO Phase 2 Shared Use Path Project is an off-system trail facility, from Ogden BDO (at SR-39) to 2000 South Project is an off-system trail facility, from Ogden BDO (at SR-39) to 2000 South Roads & infrastructure · Proposed
- SR-39 & SR-158; Curve Delineation & Rumble Strips SR-39; MP 34.40 - 55.50 & SR-39; MP 22.20 - 27.70 & SR-158; MP .00 - 1 SR-39; MP 34.40 - 55.50 & SR-39; MP 22.20 - 27.70 & SR-158; MP .00 - 11.61 Roads & infrastructure · Proposed
- UTN: Hill AF Base Three Gate Trail - Study Trail Study (separated from roadway) Trail Study (separated from roadway) Roads & infrastructure · Proposed
- Various Locations, WWD Ramp Upgrades SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .0 SR-67; MP .00 - 11.50 & SR-67; MP .00 - 11.50 & I-84; MP .00 - 112.10 & I-84; MP .00 - 112.10 & I-15; MP 315.00 - 400.00 & I-15; MP 315.00 - 400.00 Roads & infrastructure · Approved
- Ogden Canyon Pedestrian Trail Study SR-39; MP 8.80 - 14.00 SR-39; MP 8.80 - 14.00 Roads & infrastructure · Operating / built
- TSP/ Preemption Equipment for Additional Buses US-89; MP 411.65 - 416.48 & SR-108; MP .00 - 4.01 & Cnty:FA-1478; MP .00 US-89; MP 411.65 - 416.48 & SR-108; MP .00 - 4.01 & Cnty:FA-1478; MP .00 - .80 & SR-108; MP 3.98 - 4.00 Roads & infrastructure · Proposed