Jody · Development project
BDO Phase 2 Shared Use Path Project is an off-system trail facility, from Ogden BDO (at SR-39) to 2000 South
Project is an off-system trail facility, from Ogden BDO (at SR-39) to 2000 South, Ogden (84401), UT
Roads & infrastructure · Proposed as of
On the record
- Address
- Project is an off-system trail facility, from Ogden BDO (at SR-39) to 2000 South
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 18858
- Source
- Utah Department of Transportation (udot-active-projects-lines)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- SR-39; Mt. Rd to Whisperwood (PIN 22875) SR-39; MP 7.94 - 8.04 SR-39; MP 7.94 - 8.04 Roads & infrastructure · Proposed
- UTN: Three Gate Trail Extension Trail project off-system from Weber River Parkway through Observatory Park, and along A Trail project off-system from Weber River Parkway through Observatory Park, and along A Ave to 24th St in Ogden Roads & infrastructure · Proposed
- UTN: Harrison Boulevard Trail Gap (Study) Trail project off-system located along Harrison Blvd in Ogden Trail project off-system located along Harrison Blvd in Ogden Roads & infrastructure · Proposed
- I-15; Dual Exit for NB 2700 North, Farr West I-15; MP 348.80 - 349.40 I-15; MP 348.80 - 349.40 Roads & infrastructure · Proposed
- I-15: 400 N(Pioneer Rd) Interchange Modification I-15; MP 347.05 - 347.05 I-15; MP 347.05 - 347.05 Roads & infrastructure · Proposed
- 1200 West; 400 North to 700 South Cnty:FA-3368; MP 1.62 - 2.71 Cnty:FA-3368; MP 1.62 - 2.71 Roads & infrastructure · Proposed
All projects on record in 84401 · All projects on record in 84404
Status as of , from Utah Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.