Jody · Development project
46 Route 46, Pequannock Street to CR 513 (West Main Street)
Initiated from the Safety Management System, this project will evaluate each signalized intersection within the project limits. Some of these signalized intersections have had adjustments over the past few years, however, each signalized intersection will be (re)evaluated and, if required, modified in the proposed new Road Diet design. Work will include, but not be limited too; insuring that signalized intersections have the appropriate number/type of traffic signal heads at the appropriate locations, each intersection is ADA compliant, backplates with retro reflective borders will be added to the traffic signal heads, all 8” traffic signal heads will be changed to 12”, and pedestrian signal heads include countdown technology., Dover (07801), NJ
Roads & infrastructure · Proposed as of
On the record
- Address
- Initiated from the Safety Management System, this project will evaluate each signalized intersection within the project limits. Some of these signalized intersections have had adjustments over the past few years, however, each signalized intersection will be (re)evaluated and, if required, modified in the proposed new Road Diet design. Work will include, but not be limited too; insuring that signalized intersections have the appropriate number/type of traffic signal heads at the appropriate locations, each intersection is ADA compliant, backplates with retro reflective borders will be added to the traffic signal heads, all 8” traffic signal heads will be changed to 12”, and pedestrian signal heads include countdown technology.
- Type
- Roads & infrastructure
- Where it stands
- Proposed
- Status as of
- Date on record
- (filed)
- Record number
- 163180
- Source
- New Jersey Department of Transportation (nj-stip-projects)
- Official record
- View the source record
Where it is
On the Jody page for these ZIP codes:
More projects in these ZIP codes
- CR 644 East Main Street (CR 644), Bridge over Rockaway River The existing bridge is a three span stone masonry and concrete arch with fill and a concrete sidewalk on rolled steel stringers. The bridge was originally built circa 1840. A steel stringer sidewalk on east side dates to 1890 and is supported on stone abutments and steel caissons. The west side was widened with concrete in 1905, rehabilitation in 1964 and 1993. The structure is classified as structurally deficient due to the condition of the superstructure and substructure. The superstructure is rated poor. Roads & infrastructure · Proposed
- 15 Route 15 Corridor, Rockfall Mitigation, Contract B This section of rock cuts includes the 2 highest-ranked cut slopes within the Rockfall Hazard Management System (RHMS) yet to be assigned for mitigation design; the group contains several other cut slopes ranked within the top 12%. The slopes exhibit many loose boulders and overhanging blocks, which, in conjunction with the limited catch areas, present the potential for falling material to impact the traveled roadway. In addition, within the last year, one location had a Rockfall event where a 20-ton boulder fell upon guiderail. Roads & infrastructure · Proposed
- 46 Route 46, Main Street/Woodstone Road (CR 644) to Route 80 Initiated by the Bureau of ITS Engineering, this project is a breakout from Route 46, I-80 to I-80/280, ITS Improvements study (DB# 06366). This project will provide operational and safety improvements within the project limits. Roads & infrastructure · Proposed
Status as of , from New Jersey Department of Transportation's public records. The name, address, record number, date and status are the source's own; nothing on this page is generated or inferred.